top of page
RESOURCE LIBRARY
All BTTB resources are free to access.
Scenario Discussions - Task, Completion, Review
An activity that selects random themes for discussion. Relates to work that a bricklayer should have completed, their planning and their...
Foundation width exercise
You can download the table 10 (Building Regulations and the student worksheet), it also contains the link to the randomiser Follow this...
Scenario Discussions - Task, Time, Weather
An activity that selects random scenarios to stimulate discussion. What precautions or different operating practices might you adopt in...
Materials Acronyms and Abbreviations
Hidden match cards containing the name and a matched abbreviation used within materials and component identification. Identify the...
Scaffolding HyperDoc
Multiple Choice - 20 Questions Twenty multiple choice questions linked through a HyperDoc image. Ideal revision for level 2 learners who...
Eight Images = Eight Questions
You need to scroll over the picture and locate the eight images that have a link. Each link is a question on that material or resource....
Health and Safety Acronyms
Memory game: Hidden match cards containing the full name and a matched abbreviation used within health and safety. Identify the correct...
Positioning Cavity Wall Ties (tutor marked)
Five cavity wall scenarios for which cavity wall tie placement requires identification. Students can drag and drop the markers to the...
Setting Out & Constructing Arch Terms (H5P)
Three drag and drop slides that accompany the PowerPoint Presentation of Arch Construction and Terminology Follow this link or click on...
* Commonly Used Calculation Formulas
12 useful calculation formulas to be mapped to the description. Follow this link or click on the image to be taken directly to the resource
Brickwork Bonding (tutor marked)
10 drag and drop bonding exercises. Students can complete these activities, ideally on a PC. These 10 exercises can also be carried out...
Cavity Wall Construction Sequence (H5P)
20 short statements listing the sequence of work operations to construct a simple cavity wall with short return. Place them in the...
Roofing Components - Name and Description (H5P)
23 roofing images with name and description to match. Follow this link or click on the image below to be taken directly to the resource
* Cavity Wall Flow Questions (numbers) (H5P)
Answer each question, obtain the next question and continue until you have completed this flow activity Follow this link or click on the...
Information Sources / Core Unit (H5P)
Match the A and B statements/images. There are 50 pairs covering a wide range of topics within information sources and technology. Follow...
bottom of page